Rail Trail Overlay 7th St. to Highway 165

The Los Banos Public Works team completed an asphalt overlay to the 7th St. to Highway 165 portion of the Rail Trail.

The section, 2nd St. to 7th St., was completed in Fall 2021, providing a safe and refreshed travel surface from 2nd St. to Highway 165 on the Rail Trail Corridor.